Rocom — Part 2: Conformance
1. Conformance Dimensions
A system claiming Rocom conformance declares a coordination service level per control-plane interface (SERVICE-LEVELS.md §2). Coordination level expresses the degree of machine integration, state awareness and dynamic coordination supported by a specific plane interface. It is separate from deployment scope, deployment stage, security maturity and certification scope.
Coordination levels L1–L3 are cumulative within a plane: a declaration at L3 satisfies all L1 and L2 requirements for that plane. See SERVICE-LEVELS.md for the full model, per-plane requirements and composition rules.
Security, identity-trust and data-governance requirements carry their own maturity tiers (e.g., security_tier in Part 6, dg_tier in Part 7). A coordination level SHALL NOT waive any applicable assurance requirement (cpl-req-006).
1.1 Dimensions
Conformance has independent dimensions:
- Coordination service level (L0–L3 per plane): the degree of machine integration, state awareness and dynamic coordination. Defined in SERVICE-LEVELS.md.
- Deployment scope (
single_site/multi_site): the deployment topology covered by the claim. - Profile (General / Healthcare): domain-specific requirements. The Healthcare profile adds chain-of-custody, restricted zone enforcement, and compliance event reporting. These requirements may be declared at any coordination level.
- Security / data-governance maturity: tiered requirements in Part 6 and Part 7 independent of coordination level.
- Service-quality profile: versioned, measurable timing, freshness, availability and recovery commitments.
A system declaring the Healthcare profile at L1 coordination satisfies all L1 coordination requirements plus the Healthcare profile additions.
1.2 Legacy Level Definitions
Historical declarations used L1 = Pilot, L2 = Single Site, L3 = Multi-Site. These labels referred to deployment scale, not coordination capability. They SHALL NOT be mechanically converted into new coordination levels (cpl-req-1001). Historical claims retain their original meaning; new claims require the new declaration model and evidence (SERVICE-LEVELS.md §9).
| Legacy | Meaning | Migration |
|---|---|---|
| L1 / Pilot | Proof-of-concept evaluation | Requires new per-plane declaration |
| L2 / Single Site | Single deployment production | Requires new per-plane declaration |
| L3 / Multi-Site | Multi-deployment federated | Requires new per-plane declaration |
The migration ledger documents every affected requirement.
2. Conformance Declaration
A conformant implementation MUST produce a Conformance Statement following the template below. The statement is a public document published by the implementer. The build_provenance section is mandatory: conformance claims must be reproducible against an identifiable build artifact, not against source code alone.
3. Conformance Statement Template
# Rocom Conformance Statement
# Schema version identifies the declaration format (rocom-conformance/control-planes-1.0)
schema_version: "rocom-conformance/control-planes-1.0"
# Specification edition this declaration targets
specification:
edition: "2026a" # e.g. "2025d", "2026a"
supplements_in_scope: ["sup-003", "sup-007"] # supplements that apply
# Implementer
implementer:
organization: "TODO — organization name"
product: "TODO — product name and version"
contact: "TODO — email or URL for conformance inquiries"
statement_date: "TODO — YYYY-MM-DD"
# Deployment context
context:
profile: "General" # or "Healthcare"
deployment_scope: "single_site" # or "multi_site"
deployment_stage: "production" # or "evaluation"
sites:
- name: "site-alpha"
location: "TODO — facility identifier"
# ── Coordination Interfaces ──
# Each interface declares: target level (what the workflow requires),
# declared level (what the implementer claims), and provision state
# (whether the interface is actually provided).
coordination:
model_version: "control-plane-levels-1.0"
interfaces:
- id: "robot-adapter" # unique identifier
plane: robot # robot | infrastructure | workforce | task
provision: provided # provided | planned | not_provided
declared_level: L1 # L0, L1, L2, or L3
target_level: L1 # level required by workflow
verification_status: conformant # conformant / partial / not_tested
requirement_ids: ["cpl-req-101", "cpl-req-102"] # for L3: all applicable requirements
- id: "infra-adapter"
plane: infrastructure
provision: provided
declared_level: L1
target_level: L1
verification_status: conformant
- id: "workforce-prov"
plane: workforce
provision: planned # L0 manual handoff is permitted
declared_level: L0
target_level: L0
verification_status: not_tested
- id: "task-source"
plane: task
provision: provided
declared_level: L1
target_level: L1
verification_status: conformant
# ── Workflow Verification ──
# End-to-end level is determined by the lowest coordinating interface.
# cpl-req-503: end-to-end L3 requires every necessary interface at L3.
workflows:
- id: "meal-transport"
description: "Meal tray delivery via robot + task source"
participating_interfaces: ["robot-adapter", "task-source"]
requirements:
- interface: "robot-adapter"
minimum_level: L1
- interface: "task-source"
minimum_level: L1
target_end_to_end_level: L1
verified_end_to_end_level: L1
# ── Scope Tiers (independent of coordination level, per cpl-req-006) ──
scope_tiers:
security_tier: 1 # Part 6: 1=evaluation, 2=production, 3=multi-site
dg_tier: 1 # Part 7: 1=evaluation, 2=production, 3=multi-site
# ── Legacy Parts Declaration (backward compatibility) ──
# Implementers targeting pre-2026a editions may use parts_declared.
# New declarations SHOULD use coordination.interfaces + scope_tiers above.
parts_declared:
- part: 1
level: L1 # legacy — see §1.2
status: conformant
- part: 2
level: L1
status: conformant
- part: 5
level: L1
status: conformant
- part: 6
security_tier: 1
status: conformant
- part: 7
dg_tier: 1
status: conformant
# ── Deviations ──
# For each interface with verification_status=partial, or Part with status=partial:
deviations:
- interface: "robot-adapter" # or part: 5
requirement: "cpl-req-102"
status: not-implemented
severity: minor # critical / major / minor
rationale: "TODO — explanation"
planned_resolution: "TODO — target date or edition"
# ── Policy References (Sup-007) ──
# Facility- or site-specific policy references that govern this deployment.
policy_references:
- policy_id: "facility-transport-policy-v1"
namespace: "urn:example:facility:transport"
version: "1.0.0"
digest: "sha256:..."
issuer: "spiffe://example.local/authority/policy"
approval_ref: "board-minutes-2026-10-01/item-3"
valid_from: "2026-10-01T00:00:00Z"
scope:
interfaces: ["robot", "infrastructure"]
workflows: ["meal-transport"]
# ── Build Provenance ──
# Conformance claims must be tied to an identifiable build. Source code
# alone does not constitute evidence: the compiled artifact, toolchain,
# and build environment must be reproducible for audit.
build_provenance:
toolchain: "TODO — compiler/runtime and version (e.g., 'Ferrocene 26.02.0', 'rustc 1.75.0')"
target: "TODO — compilation target triple (e.g., 'x86_64-unknown-linux-gnu')"
build_command: "TODO — reproducible build command (e.g., 'cargo build --release')"
artifact_hash: "TODO — SHA-256 of the compiled binary or test artifact"
build_log_reference: "TODO — URL or path to the build log"
# Test Evidence
test_evidence:
conformance_tests_executed:
- test_id: "TODO — e.g., DG-01, ID-01, cpl-test-101"
result: pass # pass / fail / not-applicable
policy_version: "TODO — policy version applied, if any (Sup-007)"
notes: "TODO — test date, environment, any conditions"
# Certification (optional)
certification:
certified_by: "TODO — certification body, or 'self-declared'"
certificate_id: "TODO — certificate reference"
scope_tier: "TODO — security_tier or dg_tier certified"
coordination_levels_covered: ["L1"] # legacy: was 'level'
valid_until: "TODO — YYYY-MM-DD"4. Partial Conformance
Partial conformance is permitted. An implementer declaring partial conformance MUST:
- List every non-conforming requirement in the
deviationssection. - Provide a rationale for each deviation.
- Classify each deviation severity (critical, major, minor).
- Indicate a planned resolution date or target edition.
Systems with more than three deviations at coordination levels L2 or above, or at security_tier ≥ 2, or dg_tier ≥ 2 are not eligible for Rocom Certified status. See Sup-005 CP-REQ-10.
5. Formal Certification
Formal Rocom Certified status is awarded by independent Certification Providers under ROCOM Board oversight upon successful execution of the full conformance test suite at the declared coordination level, profile, and applicable scope tiers. The Certification Program is defined in Sup-005 (Certification Provider Requirements). During the transition period before providers are appointed, self-declaration of conformance remains available.
Three distinct conformance outcomes: 1. Self-declaration: The implementer declares conformance against the specification. No independent verification required. 2. Validator/portal validation: An automated tool or portal runs the conformance test suite and produces a report. This is a validation aid, NOT formal certification. The portal operator is not the certification authority. 3. Formal Rocom Certified: Awarded by an independent Certification Provider (Sup-005, IND-REQ-02: not under same corporate ownership as the implementer). Only this outcome may use the “Rocom Certified” mark.
5.2 Legacy certification — no automatic translation
A legacy certificate (pre-Edition 2026a) with level: L3 or level: multi-site does NOT automatically imply coordination level L3 under the new model. Coordination capability must be demonstrated per interface under the new declaration model (§3). Legacy certificates remain valid for their original scope until expiration but SHALL NOT be used to claim end-to-end L3 coordination without the corresponding per-interface evidence.
5.3 Deviation Severity
Declarations of partial conformance must classify each deviation:
| Severity | Definition | Certification impact |
|---|---|---|
| Critical | Security vulnerability, safety hazard, or data integrity failure | Certification blocked. Must be resolved before certification. |
| Major | Missing normative requirement that affects interoperability | Maximum 1 major deviation permitted. |
| Minor | Implementation difference that does not affect interoperability | Maximum 2 minor deviations permitted. |
Systems with more than three deviations total (any severity) at coordination levels L2 or above, or at security_tier ≥ 2, or dg_tier ≥ 2 are not eligible for Rocom Certified status. One or more Critical deviations block certification regardless of level or tier.