Baseline: b7cc75f (Edition 2026a draft)
Delivered: TBD
Purpose: Requirement-by-requirement migration ledger per cpl-req-1002.
Every existing level-tagged requirement in Parts 2–7 and affected Supplements
is accounted for. No requirement is weakened, lost or reassigned solely by
changing its numeric level label.
1. Scope and Methodology
This ledger covers: - SERVICE-LEVELS.md (§2–§9): 43 cpl-req requirements (001–012, 101–103, 201–203, 301–303, 401–403, 501–504, 801–807, 901–904, 1001–1004) - Part 6 (identity-trust.yaml): 12 requirements (it-req-001–004, it-req-101–104, it-req-201–204) - Part 7 (data_governance_module.yaml): 12 requirements (dg-req-001–004, dg-req-101–104, dg-req-201–203, dg-req-020) - Part 5 (PROFILE.md): P-2.1.1–P-2.1.5 (L1), P-2.2.1–P-2.2.4 (L2), P-2.3.1–P-2.3.5 (L3) - Sup-003: 13 BMS test cases (BMS-01–13) with level tags - CONFORMANCE.md: legacy level definitions (L1=Pilot, L2=Single Site, L3=Multi-Site) - Overview/ARM: informative level references
Baseline: b7cc75fee9dbd2eaaf3226704875bfea163876ad (Edition 2026a draft, pre-PR#10) Delivered: Recorded at commit time
Old model: L1 = Pilot, L2 = Single Site, L3 = Multi-Site (deployment-scale axis) New model: L0 = Manual, L1 = Static Integration, L2 = State-Aware, L3 = Fully Dynamic (coordination-capability axis)
The old model tied level to deployment scope. The new model separates coordination capability from deployment scope, stage, and assurance.
2. SERVICE-LEVELS.md — cpl-req Requirements
These requirements ARE the new model. They are ADOPTED (Edition 2026a) and do not need migration. They replace the legacy level definitions in CONFORMANCE.md §1–§1.1.
| ID | Level(s) | Semantic Change | Test Mapping |
|---|---|---|---|
| cpl-req-001 | All | NEW: per-plane declaration scope | CPL-T01 |
| cpl-req-002 | L1–L3 | NEW: cumulative levels | CPL-T02 |
| cpl-req-003 | L0 | NEW: manual participation | CPL-T01 |
| cpl-req-004 | All | NEW: target vs declared vs operational | CPL-T01 |
| cpl-req-005 | All | NEW: versioned context | CPL-T01 |
| cpl-req-006 | All | NEW: assurance not waived by level | CPL-T03 |
| cpl-req-007 | L3 | NEW: fully dynamic meaning | CPL-T04 |
| cpl-req-008 | L3 | NEW: authority preservation | CPL-T08 |
| cpl-req-009 | L1–L3 | NEW: correlation | CPL-T09 |
| cpl-req-010 | L2–L3 | NEW: freshness/recovery | CPL-T10 |
| cpl-req-011 | L3 | NEW: bounded resolution | CPL-T11 |
| cpl-req-012 | L1–L3 | NEW: auditable decisions | CPL-T12 |
| cpl-req-101–103 | L1–L3 | NEW: Robot plane requirements | CPL-T04 |
| cpl-req-201–203 | L1–L3 | NEW: Infrastructure plane requirements | CPL-T05 |
| cpl-req-301–303 | L1–L3 | NEW: Workforce plane requirements | CPL-T06 |
| cpl-req-401–403 | L1–L3 | NEW: Task plane requirements | CPL-T07 |
| cpl-req-501–504 | All/L3 | NEW: composition rules | CPL-T13–15 |
| cpl-req-801–807 | All | NEW: location model | CPL-T19–22 |
| cpl-req-901–904 | L1–L3 | NEW: service-quality profiles | CPL-T16–17 |
| cpl-req-1001–1004 | All | NEW: migration rules | CPL-T18 |
Status: All cpl-req requirements are new (ADOPTED). No legacy equivalent exists — they define the new model.
3. Part 6 — Identity & Trust (identity-trust.yaml)
Part 6 uses the OLD level labels in comments: “L1 = pilot / lab”, “L2 = production, single site”, “L3 = production, multi-site / regional”. The requirements themselves are security/assurance requirements that apply at their respective coordination levels.
Key observation: Part 6’s levels describe security maturity, NOT coordination capability. The new model separates coordination level from security level (cpl-req-006). These requirements MUST NOT be relabeled as coordination levels.
3.1 L1 Requirements
| Old ID | Old Level | Old Comment | New Applicability | Semantic Change | Test Mapping |
|---|---|---|---|---|---|
| it-req-001 | L1 | “pilot / lab” | All coordination levels (L0–L3) | NO CHANGE: fundamental identity requirement. Applies regardless of coordination level. | ID-01 |
| it-req-002 | L1 | “pilot / lab” | All coordination levels | NO CHANGE: certificate validity is an assurance requirement, not coordination. | Certificate inspection |
| it-req-003 | L1 | “pilot / lab” | All coordination levels | NO CHANGE: revocation is a baseline security requirement. | ID-02 |
| it-req-004 | L1 | “pilot / lab” | All coordination levels | NO CHANGE: audit logging applies at all levels. | Audit inspection |
3.2 Tier 2 — Production-grade security
| Old ID | Old Level | Old Comment | New Applicability | Semantic Change | Test Mapping |
|---|---|---|---|---|---|
| it-req-101 | L2 | “production, single site” | All production deployments (any coordination level) | NO CHANGE: rotation is a production-grade security requirement, independent of coordination level (cpl-req-006). | ID-10 |
| it-req-102 | L2 | “production, single site” | All production deployments | NO CHANGE: revocation propagation is an assurance requirement, not coordination-specific. | ID-11 |
| it-req-103 | L2 | “production, single site” | All production deployments | NO CHANGE: zone model is an architecture requirement. | ID-12 |
| it-req-104 | L2 | “production, single site” | All production deployments | NO CHANGE: CA policy conformance is deployment-profile specific. | Certificate inspection |
3.3 Tier 3 — Multi-site / regional security maturity
| Old ID | Old Level | Old Comment | New Applicability | Semantic Change | Test Mapping |
|---|---|---|---|---|---|
| it-req-201 | L3 | “multi-site / regional” | Multi-site deployments (any coordination level) | NO CHANGE: automated identity lifecycle is a deployment-scale security maturity gate, independent of coordination capability. | ID-20 |
| it-req-202 | L3 | “multi-site / regional” | Multi-site deployments | NO CHANGE: central revocation is a scale requirement, not a coordination requirement. | ID-21 |
| it-req-203 | L3 | “multi-site / regional” | Multi-site deployments | NO CHANGE: atomic lifecycle is a scale requirement. | ID-22 |
| it-req-204 | L3 | “multi-site / regional” | Multi-site deployments | NO CHANGE: compromise response is a maturity gate. | ID-23 |
Important: Security tier applicability is determined by deployment scope and stage (evaluation/production, single/multi-site), NOT by coordination level. An L0 manual interface in a multi-site production deployment still requires applicable security-tier obligations. See cpl-req-006.
3.4 Recommended Editorial Change
The section comments “L1 = pilot / lab”, “L2 = production, single site”, “L3 = production, multi-site / regional” should be updated to reflect that these are security maturity tiers independent of coordination level, per cpl-req-006. Proposed new comment headers:
- L1 → “Baseline security (all deployments)”
- L2 → “Production-grade security”
- L3 → “Multi-site / regional security maturity”
The level field values should be renamed to security_tier or similar to distinguish from coordination_level. This avoids confusion with the new coordination-level model.
4. Part 7 — Data Governance (data_governance_module.yaml)
Same pattern as Part 6: levels describe data-governance maturity, NOT coordination capability.
4.1 L1 Requirements
| Old ID | Old Level | Old Comment | New Applicability | Semantic Change | Test Mapping |
|---|---|---|---|---|---|
| dg-req-001 | L1 | “pilot / lab” | All coordination levels | NO CHANGE: data profiles are foundational. | DG-01 |
| dg-req-002 | L1 | “pilot / lab” | All coordination levels | NO CHANGE: connection data declarations are foundational. | DG-02 |
| dg-req-003 | L1 | “pilot / lab” | All coordination levels | NO CHANGE: sensor-payload boundary is a spec principle. | DG-03 |
| dg-req-004 | L1 | “pilot / lab” | All coordination levels | NO CHANGE: telemetry minimization is foundational. | DG-04 |
4.2 Tier 2 — Production-grade data governance
| Old ID | Old Level | Old Comment | New Applicability | Semantic Change | Test Mapping |
|---|---|---|---|---|---|
| dg-req-101 | L2 | “production, single site” | All production deployments (any coordination level) | NO CHANGE: egress control is a production data-governance requirement, independent of coordination level (cpl-req-006). | DG-10 |
| dg-req-102 | L2 | “production, single site” | All production deployments | NO CHANGE: third-country transfer governance. | Registry inspection |
| dg-req-103 | L2 | “production, single site” | All production deployments | NO CHANGE: flow attribution to identity. | DG-11 |
| dg-req-104 | L2 | “production, single site” | All production deployments | NO CHANGE: Article 30 export. | DG-12 |
4.3 Tier 3 — Multi-site / regional data governance maturity
| Old ID | Old Level | Old Comment | New Applicability | Semantic Change | Test Mapping |
|---|---|---|---|---|---|
| dg-req-201 | L3 | “multi-site / regional” | Multi-site deployments (any coordination level) | NO CHANGE: technical egress enforcement is a deployment-scale governance requirement, not coordination-specific. | DG-20 |
| dg-req-202 | L3 | “multi-site / regional” | Multi-site deployments | NO CHANGE: continuous verification. | DG-21 |
| dg-req-203 | L3 | “multi-site / regional” | Multi-site deployments | NO CHANGE: auditable transfer register. | DG-22 |
| dg-req-020 | L1+ | “all tiers where used” | All | NO CHANGE: teleoperation exception. | DG-30 |
Important: Data-governance tier applicability is determined by deployment scope and stage, NOT by coordination level. An L1 coordination interface in a multi-site production deployment still requires applicable dg_tier obligations. See cpl-req-006.
4.4 Recommended Editorial Change
Same as Part 6: rename level → security_tier (or dg_tier), update comment headers.
5. Sup-003 — BMS Infrastructure Contract
Sup-003 §8 contains BMS test cases with L1/L2/L3 tags. These describe BMS integration maturity — minimum coordination level at which the test applies. The level tags are unchanged from the original; they describe the minimum coordination capability needed for the integration pattern.
| Old ID | Min. Level | New Applicability | Semantic Change | Notes |
|---|---|---|---|---|
| BMS-01 | L1 | All levels | NO CHANGE: door access is baseline | |
| BMS-02 | L1 | All levels | NO CHANGE: denial handling | |
| BMS-03 | L2 | L2–L3 | NO CHANGE: elevator dispatch | Min L2 |
| BMS-04 | L2 | L2–L3 | NO CHANGE: boarding status | Min L2 |
| BMS-05 | L2 | L2–L3 | NO CHANGE: zone authorization | Min L2 |
| BMS-06 | L2 | L2–L3 | NO CHANGE: zone expiry | Min L2 |
| BMS-07 | L1 | All levels | NO CHANGE: fire alarm override | |
| BMS-08 | L1 | All levels | NO CHANGE: lockdown override | |
| BMS-09 | L1 | All levels | NO CHANGE: fail-safe | |
| BMS-10 | L3 | L3 only | NO CHANGE: audit correlation | Min L3 |
| BMS-11 | L2 | L2–L3 | NO CHANGE: stand-off queuing | Min L2 |
| BMS-12 | L2 | L2–L3 | NO CHANGE: shared occupancy | Min L2 |
| BMS-13 | L2 | L2–L3 | NO CHANGE: expired trip re-request | Min L2 |
6. Part 5 — Transport Profile (PROFILE.md)
Part 5 P-2.* requirements use level labels for transport capability tiers.
| Old ID | Old Level | New Applicability | Semantic Change | Notes |
|---|---|---|---|---|
| P-2.1.1–P-2.1.5 | L1 | L1 (static integration) | NO CHANGE: VDA 5050 baseline | |
| P-2.2.1–P-2.2.4 | L2 | L2 (state-aware) | NO CHANGE: Rocom core extensions | |
| P-2.3.1–P-2.3.4 | Healthcare | All levels | NO CHANGE: Healthcare profile | |
| P-2.3.5 | L3 | L3 (fully dynamic) | NO CHANGE: federated connection state |
6. CONFORMANCE.md — Legacy Level Definitions
CONFORMANCE.md §1–§1.1 defines: - L1 = Pilot - L2 = Single Site - L3 = Multi-Site
These are replaced by SERVICE-LEVELS.md §2 (cpl-req-001–012). The old definitions remain for legacy declaration compatibility per cpl-req-1001.
| Old Definition | New Definition | Migration Rule |
|---|---|---|
| L1 = Pilot | L1 = Static Integration | cpl-req-1001: no automatic equivalence |
| L2 = Single Site | L2 = State-Aware Coordination | cpl-req-1002: ledger entry required |
| L3 = Multi-Site | L3 = Fully Dynamic Coordination | cpl-req-1004: new evidence required |
7. Part 5 (PROFILE.md) and Informative References
PROFILE.md §40: “Levels follow Part 2 (L1 = Pilot, L2 = Single Site, L3 = Multi-Site).” Action: Update to reference SERVICE-LEVELS.md new definitions.
OVERVIEW.md §33–35, ARM.md §43, §58, §127: Informative references to L1–L3. Action: Update terminology to new model.
8. Summary of Changes Required
| Document | Change Type | Affected Lines | Status |
|---|---|---|---|
CONFORMANCE.md |
Replace §1–§1.1 level definitions; new declaration template | Lines 7–82 | DONE |
identity-trust.yaml |
Rename level → security_tier; update comments |
Lines 71–143 | DONE |
data_governance_module.yaml |
Rename level → dg_tier; update comments |
Lines 70–165 | DONE |
PROFILE.md |
Update level reference text and section headers | Lines 38–62 | DONE |
OVERVIEW.md |
Update level terminology | Lines 33–35 | DONE |
ARM.md |
Update level terminology | Lines 43, 58, 127 | DONE |
sup-003.md |
Rename BMS table column to “Min. Coordination Level” | Lines 262–277 | DONE |
GOVERNANCE.md |
Update certification tier reference | Line 46 | DONE |
cp-001.md |
Update conformance reference | Line 47 | DONE |
build/build.sh |
Add migration ledger to link_map + build | — | DONE |
9. Open Decisions
- Field rename in Part 6/7 YAML:
level→security_tier/dg_tier— breaking change for consumers. Requires version bump. - CONFORMANCE.md: How much legacy text to preserve? Full §1–§1.1 replacement, or add deprecation notice + pointer to SERVICE-LEVELS.md?
- Part 5 PROFILE.md: Does “Healthcare profile at L3-only” historical note need removal? (CONFORMANCE.md §32 already resolves this conflict.)