CP-008 — Resource Authority Model

Target: Part 4 — Service Contracts Also affects: Part 3 (Information Model), Part 5 (Transport Profile), Sup-003 (BMS Infrastructure Contract) Raised: 30 August 2026 Author: Rocom Project Depends on: CP-007 (agent identity), Sup-003 (BMS contract)


1. Problem

Rocom currently has no explicit model of the shared resources agents compete for. Space, doors, lifts, docks and tasks are all contended, but the standard treats access to them as an implicit property of movement. Four consequences follow, all observed in implementation:

  1. Grants have no lifetime. A door is “granted” with no endpoint and no expiry, so no implementation can tell whether a grant is still valid.
  2. Release is implicit. An agent that has passed a door never states that it has released it. Nobody can determine who currently holds what.
  3. Capacity is not expressible. A door is exclusive; a lift carries several agents. The model has no way to say so, so lift capacity lives in vendor code.
  4. No behaviour is defined for communication loss. An agent that loses contact with the orchestrator has no specified obligation regarding resources it holds.

A robot from another supplier cannot behave correctly in a shared building without this model. It is therefore a contract between independent parties, and belongs in the open standard.

2. Design basis (informative)

Two mature domains solve the same problem, and this proposal adopts their vocabulary where it fits.

Railway signalling (ETCS/ERTMS). A train does not receive a permission to move in general; it receives a movement authority with a defined end point and validity, and must brake if it expires or cannot be renewed. Sections are released explicitly behind the train, and loss of radio contact with the block centre causes a safe stop.

Air traffic control. Short-term conflict alert (STCA) and medium-term conflict detection (MTCD) compare predicted trajectories and raise a warning before separation is lost. Arrival managers (AMAN) sequence traffic through a single constrained resource — a runway — rather than serving first-come-first-served.

Airspace block reservation (military air operations). A volume of airspace is reserved for a using unit over a stated time window. Within that block, the unit manoeuvres freely and does not clear each movement individually; outside it, or after it expires, the unit has no standing permission. Deconfliction happens once, when the block is allocated — not continuously, movement by movement. Blocks may be released early when no longer needed, and the airspace returns to the pool.

Two properties are worth adopting directly. First, deconfliction is front-loaded: the cost of coordination is paid once per block rather than once per movement, which is what makes the model scale. Second, freedom inside the block is total and freedom outside it is nil — there is no gradient, and therefore no ambiguity about what is permitted.

Multi-fleet robotics (Open-RMF). Open-RMF maintains a central Traffic Schedule Database holding the intended trajectories of every participating fleet. Its job is to identify conflicts in those intentions and notify the fleets; when a conflict is found, a negotiation begins between the fleet adapters, each proposing itineraries that can accommodate the others, with defined rejection and forfeit paths. Resolution proposes alternatives — slow down, pause, reroute — rather than simply assigning right of way. Integration is offered at several levels, with a defined message set per level, so a vendor fleet manager can participate without surrendering control. In deployments pairing RMF with Nav2, RMF keeps schedule control while the local stack handles path planning and obstacle avoidance.

Rocom differs from RMF on one deliberate point, stated in §5: RMF schedules trajectories; Rocom schedules commitments. The reason is given there.

What a mobile robot actually is. Topologically it is a train: it traverses an ordered sequence of resources, and the sequence is what matters. Kinematically it is neither train nor aircraft. A train has no lateral freedom — the rail is the route. An aircraft moves freely in three dimensions and rotates about all three axes. A mobile robot keeps lateral freedom within a tolerance band around its route, and unconstrained rotation about its vertical axis.

Rocom therefore grants authority over resources, not over trajectories.

Boundary, normative in effect. Rocom borrows these concepts, not their safety integrity. ETCS and ATC systems are certified to defined safety-integrity levels; Rocom is not a safety system. As stated in Sup-003, the building’s own safety systems remain authoritative at all times, and no requirement in this proposal may be read as a safety function. An implementation SHALL fail safe by yielding, never by overriding a building system.

3. Normative requirements

3.1 Resource model

RA-01 — A contended resource SHALL be declared with a resource_type and a capacity. capacity is 1 for exclusive resources and n > 1 for capacity-limited resources.

RA-02 — The following resource types are defined: space (a cell or zone), passage (door, gate), transport (lift, conveyor), dock (charging or rest position) and task. Implementations MAY define additional types; they SHALL NOT redefine these.

RA-03 — An agent SHALL hold a valid authority for a resource before entering or occupying it. An implementation SHALL NOT rely on movement itself as an implicit claim.

3.2 Authority

RA-04 — An authority SHALL carry: the resource, the holding agent (identified per CP-007), an end point, a validity expiry, and an issue timestamp.

RA-05 — An authority SHALL expire. An implementation SHALL NOT issue an authority without an expiry.

RA-06 — An agent whose authority has expired and cannot be renewed SHALL stop before the resource and SHALL NOT enter it.

RA-07 — An authority MAY be renewed before expiry. Renewal SHALL be an explicit exchange, not an assumption.

3.3 Release

RA-08 — An agent SHALL release a resource explicitly when it no longer occupies it. Release SHALL be an event, observable in the audit chain.

RA-09 — An implementation SHALL be able to report, at any time, which agent holds which resource and until when.

3.4 Lateral freedom and local avoidance

RA-15 — An authority for a space resource SHALL state a lateral tolerance: the band around the planned route within which the agent may deviate without a new authority.

RA-16 — Rotation about the agent’s vertical axis SHALL NOT require authority. Rotation is not a change of resource.

RA-17 — An agent SHALL remain within its lateral tolerance. A deviation that would take the agent into a different resource requires a new authority before the movement is executed.

RA-18 — Local avoidance of unregistered obstacles — people, equipment, temporary objects — is the agent’s own responsibility and SHALL NOT require orchestrator approval while the agent stays within its lateral tolerance. The agent SHALL report the avoidance as an event.

RA-18 is deliberate: requiring an orchestrator round trip before yielding to a person would be both technically wrong and, in a hospital, indefensible. The robot yields first and reports afterwards.

3.5 Block reservation

RA-19 — An implementation MAY grant authority over a block: a set of resources reserved together for one holder over one interval, rather than granting each resource separately.

RA-20 — Within a granted block, the holder SHALL move freely between the included resources without requesting further authority. Outside the block, or after its expiry, the holder has no authority whatsoever.

RA-21 — A block SHALL be deconflicted once, at grant time, against all other held blocks and authorities. An implementation SHALL NOT require per-movement deconfliction within a granted block.

RA-22 — A holder SHALL release a block, in whole or in part, as soon as it is no longer needed. Released resources return to the pool immediately and SHALL NOT wait for the block’s expiry.

Block reservation is the mechanism that makes coordination scale: the cost of deconfliction is paid once per block rather than once per movement. It is particularly suited to a fleet operating a defined ward or corridor section for a shift, and to any participant that wants to plan internally without a round trip per step. Note that the freedom is binary by design — total inside the block, none outside — so that no implementation has to reason about a gradient.

3.6 Communication loss

RA-10 — An agent that loses contact with the orchestrator SHALL stop safely at the earliest safe position and SHALL NOT continue executing a previously issued plan beyond its current authority.

RA-11 — Authorities held by an agent that has lost contact SHALL be released on expiry and SHALL NOT be extended automatically.

3.7 Conflict detection

RA-12 — Where an implementation holds both a planned agent trajectory and a scheduled resource reservation (for example a lift reserved for bed transport), it SHALL compare them over a defined look-ahead window and SHALL emit a resource.conflict_predicted event when they overlap.

RA-13 — The conflict event SHALL identify the resource, the two claims, and the tick at which the overlap occurs. It SHALL NOT prescribe the resolution.

RA-14 — Resolution — which claim yields, whether the agent waits or reroutes, how urgency is weighed — is implementation-defined and outside this standard. Only detection and reporting are normative.

4. Delegated autonomy

A local fleet manager knows things Rocom does not and should not: battery state, wear, maintenance windows, charging strategy, its own cost model. It must be able to optimise on them. At the same time, several participants each holding their own view of the next hundred ticks produces several truths about the future.

4.1 The principle: standardise the commitment, not the plan

RA-23 — A predicted trajectory is private. It MAY change at any time and SHALL NOT be relied upon by other participants.

RA-24 — A commitment is public and binding: a statement that an agent will hold a named resource over a stated interval, or complete a named task by a stated time. Conflict detection under RA-12 SHALL operate on commitments, never on predictions.

This is the deliberate divergence from Open-RMF noted in §2. RMF schedules intended trajectories and resolves conflicts between them, which requires every participant to publish and mirror a living trajectory database. Committing to resources and deadlines instead keeps the shared surface small, lets each fleet keep its planning private, and removes the many-truths problem: there is only one truth about what has been promised, however many plans lie behind it.

4.2 Local replanning

Block reservation (§3.5) is the natural unit here: a fleet that holds a block can replan inside it without any exchange at all, which is the cheapest possible form of delegated autonomy.

RA-25 — A local fleet manager MAY replan freely within its own domain without orchestrator approval, provided every commitment it has made is still met.

RA-26 — A local fleet manager SHALL subscribe to resource and commitment events for the resources it uses. Whether it optimises against the wider picture is its own choice.

4.3 Bidding

RA-27 — Where an implementation allocates a task by bidding, the bid SHALL carry a cost and the commitments the bidder is willing to make. The composition of that cost is outside this standard: battery, wear, maintenance, crew or commercial factors are the bidder’s own business and SHALL NOT be required to be disclosed.

The format of the bid and the commitment is open; what goes into the bid is closed — for us and for every other fleet vendor. That is what makes participation safe for a vendor with a proprietary cost model.

This mirrors collaborative decision making in air traffic management, where the authority allocates capacity in the form of slots while operators reallocate among their own flights on criteria — crew hours, connections, aircraft rotation — the authority neither sees nor needs. The same division exists in rail: the infrastructure manager allocates paths, the operators optimise their own rolling stock within them.

4.4 Breaking a commitment

RA-28 — A participant that can no longer meet a commitment SHALL emit commitment.broken as early as it knows, naming the commitment, the reason and the earliest revised time. Silence is not an acceptable failure mode.

RA-29 — On receiving commitment.broken, an implementation SHALL re-evaluate dependent commitments. What it does about them is implementation-defined.

4.5 Levels of participation (informative)

Following Open-RMF’s approach of defining integration levels rather than one all-or-nothing interface, a fleet may participate at:

A conformance profile SHOULD state which level it claims.

5. Schema (illustrative)

resource:
  resource_id: string
  resource_type: space | passage | transport | dock | task
  capacity: integer          # 1 = exclusive

authority:
  authority_id: string
  resource_id: string
  holder: <agent_identity.access_key or serial_number>
  end_point: string          # where the authority ends
  issued_at: timestamp
  expires_at: timestamp
  renewable: boolean

authority:
  lateral_tolerance_m: number   # band around route, RA-15

block:
  block_id: string
  resources: [resource_id]      # reserved together, RA-19
  holder: <agent or fleet identity>
  from: timestamp
  until: timestamp

commitment:
  commitment_id: string
  kind: resource | task
  subject: string               # resource_id or task_id
  holder: <agent or fleet identity>
  from: timestamp
  until: timestamp

events:
  resource.authority_granted
  resource.authority_renewed
  resource.authority_expired
  resource.released
  resource.conflict_predicted
  resource.local_avoidance          # RA-18
  resource.block_granted
  resource.block_released       # whole or partial, RA-22
  commitment.made
  commitment.broken                 # RA-24

6. Relationship to Sup-003

Sup-003 specifies the BMS boundary — how a door or lift is requested and how the building responds. CP-008 specifies what a granted request is: an authority with an end point and an expiry, held by an identified agent, released explicitly. The two are complementary; Sup-003 governs the exchange, CP-008 governs the object exchanged.

Where Sup-003 and CP-008 appear to conflict, Sup-003’s safety clause prevails.

7. Conformance tests

CT-01 — A resource declared with capacity 3 accepts three simultaneous holders and rejects the fourth. CT-02 — An authority issued without an expiry is rejected. CT-03 — An agent whose authority has expired is refused entry to the resource. CT-04 — After an agent releases a resource, a query reports the resource as unheld. CT-05 — An agent that stops reporting has its authorities released at expiry, not extended. CT-06 — Two overlapping claims on one resource within the look-ahead window produce exactly one resource.conflict_predicted event naming both claims and the overlap tick. CT-07 — An agent that deviates within its stated lateral tolerance is not refused and requires no new authority; a deviation crossing into another resource is refused without one. CT-08 — Rotation in place produces no authority request. CT-09 — Local avoidance of an unregistered obstacle within tolerance completes without orchestrator approval and emits resource.local_avoidance. CT-10 — A conflict raised against a changed prediction, with all commitments intact, produces no conflict event. CT-11 — A participant that cannot meet a commitment emits commitment.broken with reason and revised time before the original until. CT-12 — A holder of a granted block moves between resources inside the block without issuing further authority requests. CT-13 — The same holder is refused entry to a resource outside its block without a separate authority. CT-14 — A partial release of a block returns exactly the released resources to the pool and leaves the remainder held.

8. Migration

Implementations that today treat grants as boolean remain conformant until Edition 2026b, provided they can report holders (RA-09). From 2026b, authorities without expiry SHOULD be rejected.