Controlled Production Changes — Zero Trust and Zero Touch

Contents
Document: Controlled Production Changes — Zero Trust and Zero Touch  DRAFT
Status: Informative guidance
License: CC-BY 4.0

This guidance proposes operational practices for ROCOM deployments. It adds no normative requirements, conformance levels or certification criteria. Applicable requirements remain in the selected specification Edition, deployment profile and approved local safety case.

1. Distinguish access from change execution

Google’s Building Secure and Reliable Systems, Chapters 3 and 5, describes complementary approaches:

Term Meaning in the cited source
Zero Trust Networking Network location alone confers no privileged access; access depends on authenticated user and device context.
Zero Touch Production (ZTP) Production changes use automation, software prevalidation or an audited emergency access mechanism.
Zero Touch Networking (ZTN) The Zero Touch approach applied to network administration through controlled tools and automation.

Here, ZTN means Zero Touch Networking. Spell out Zero Trust Networking to avoid confusing the two. Zero Touch does not mean unreviewed changes or the removal of human responsibility.

2. Apply this at ROCOM boundaries

ROCOM deployments can use an administrative service boundary with a small set of authorised operations: register an interface, rotate an identity, apply a versioned configuration, drain a service, deploy a specific artifact or restore a verified backup. This can be part of an existing service; it does not require a new microservice for each operation.

Normal administration should use those operations instead of unrestricted shell, database or broker access. Apply authorisation to the initiating person or workload, the operation and its target scope. An automation service or AI agent should receive only the authority needed for its job.

For example, a maintenance operator may request a restart of Fleet A’s adapter without authority to restart Fleet B, alter BMS permissions or change workforce eligibility. A robot’s permission to request a door opening does not include permission to modify the door’s access policy.

3. Example controls for a deployment profile

The following are proposed controls to select and test according to local risk. They are not additional ROCOM conformance requirements.

Area Example control and observable evidence
Access Separate identities and permissions for runtime workloads, maintainers and change automation; reject unauthorised targets and operations.
Change request Record the initiator, purpose, target interface/resource, intended configuration or artifact digest, expiry and approval reference.
Prevalidation Check schema, version compatibility, permissions, declared dependencies and current resource obligations before applying a change.
Approval Apply risk-based approval; use independent approval for high-impact changes. Do not make every ordinary task request a multi-party approval event.
Deployment Roll out to a bounded scope, observe results and stop expansion when declared limits are breached.
Recovery Define a tested recovery action. Database changes may require a forward repair or backup restore rather than a binary rollback.
Audit Correlate request, authorisation, execution and outcome, including refusals and failures, with the actual artifact/configuration version. Protect records from modification by the actor being audited.
Emergency access Provide explicit, time-limited breakglass access with attribution, alerting and subsequent review. Define recovery when the ordinary authorisation service is unavailable.
Networking Apply network policy, routing and broker permission changes through validated, versioned operations. Verify intended connectivity and denied paths.

4. Preserve local authority and availability

Administrative automation does not acquire authority over clinical priority, human consent, building safety or robot emergency stop. Those responsibilities remain with their respective systems. Emergency stop must remain effective without waiting for the administrative service or its approval workflow.

An unavailable change service should block new administrative changes by default. Runtime handling follows the approved degraded-mode policy and existing resource obligations. Do not infer that an occupied lift or corridor is free because a service or grant has timed out.

If an administrative proxy is used, define its redundancy, dependency limits and emergency path. Avoid making a single proxy instance the only route for every runtime and recovery operation. Reconnection alone is insufficient evidence that a recovered interface can resume new commitments.

5. Suggested verification scenarios

Use an isolated environment and record expected results before execution:

  1. A compromised Fleet A maintenance identity cannot change Fleet B, a BMS access policy or workforce permissions.
  2. An artifact/configuration digest mismatch rejects the change; a valid, authorised request is traceable to its actual execution and outcome.
  3. An adapter rollout failure stops expansion while unaffected fleets and independent workflows continue within their declared policies.
  4. Loss of the administrative service preserves local safety behaviour and prevents unapproved changes; the documented emergency path still works.
  5. Emergency access expires, produces reviewable evidence and leaves no permanent broad privilege.
  6. A failed network-policy change has a tested recovery path that does not depend solely on the connectivity that the change can remove.

Keep operational secrets, customer topology and detailed vulnerability reports in access-controlled implementation records. Publish the interoperable contract, declared limitations and evidence summary needed to assess claims.

6. Relation to the specification

This guidance supports Part 6 (identity, transport and revocation), Part 7 (attribution and data handling), Part 2 service-quality and recovery profiles, and CP-008 resource authority. It does not change their requirements or resolve Edition/level migration questions. Any proposed normative additions follow the process in CONTRIBUTING.md.

See also the ROCOM Certification Plan — Example.

References

The deployment controls and scenarios above are ROCOM guidance proposed from these principles; they are not a claim of Google endorsement or a Google certification scheme.